Stories & News

TAPS Facts: Innovation

Drones on TAPS

Constant inspection and surveillance of TAPS infrastructure is necessary for flawless, safe operations. But investigating remote stretches and hard-to-reach areas of the 800-mile pipeline and its supporting facilities, sometimes in difficult conditions, can take countless labor hours, and incur high costs and even higher safety risks.

In recent years, a group of visionary thinkers with leading-edge ideas at Alyeska, among TAPS contractors and beyond introduced an emerging technology that made the work safer, more efficient and more accurate: unmanned aircraft systems (UAS) or drones.

Alyeska and TAPS contractors use drones to monitor remote streams and creeks, get closer looks at difficult and dangerous-to-access infrastructure and landscapes, and capture data at new levels of accuracy. What used to be cumbersome work, usually produced in helicopters by numerous surveillance crew members, is now done with relatively small and lightweight drones with a few operators standing safely on the ground.

MAKING HISTORY

University of Alaska Fairbanks partnership

University of Alaska Fairbanks is part of the USDOT Unmanned Aircraft System Integration Pilot Program, and Alyeska is a partner organization that tests the use of UAS out of the pilot’s line of sight in the TAPS corridor. Together, we made drone history when we hosted the first beyond visual line of sight flight of an unmanned aircraft system along the TAPS route.

Introducing drones to TAPS

Introducing drones to TAPS

The concept of drone use on TAPS started in 2015 as a group of employee hobbyists were developing their piloting and video skills. They formed an informal committee to examine potential benefits and worked through federal regulations about UAS use by following models used around Alaska by other companies, including BP on the North Slope.

Successes of drone use and their imaging systems were instant and groundbreaking: they provided new perspectives of the visible spectrum, allowing Alyeska to detect and address issues sooner than in the past

Stories & News

TAPS Design
Earthquakes

TAPS Design

Design magnitude

TAPS is seismically designed to survive earthquakes without damage or leakage. It is engineered to withstand a maximum magnitude 8.0 earthquake around the Denali Fault and between a 5.5 and 8.5 magnitude earthquake, depending on the area.

Design movement

Maximum movement of pipe at pipeline crossing of major faults:

  • Denali Fault: 20 feet lateral, 5 feet vertical.
  • McGinnis Glacier Fault: 8 feet lateral, 6 feet vertical.
  • Donnelly Dome Fault: 3 feet lateral, 10 feet vertical.
  • Minor Potential Faults: 2 feet lateral, 2 feet vertical.

Zigzag Configuration

Aboveground sections of the pipeline are built in a zigzag configuration to allow for expansion or contraction of the pipe because of temperature changes. The design also allows for pipeline movement caused by an earthquake.

Earthquake events
TAPS Facts

Earthquake events

Denali Fault, November 3, 2002

The pipeline withstood a magnitude 7.9 earthquake that was centered along the Denali Fault in Interior Alaska. The ground along the fault moved an estimated 18 feet horizontally and nearly 2.5 feet vertically below TAPS without inflicting any significant damage. The quake was the largest on the Denali Fault since at least 1912 and among the strongest earthquakes recorded in North America in the last 100 years.

November 30, 2018

A magnitude 7.0 earthquake struck north of Anchorage on November 30, 2018. There was no damage to TAPS.

Misc.
Earthquakes

Misc.

Faults crossed by TAPS

Denali, McGinnis Glacier and Donnelly Dome

Monitoring

Seismograph instrumentation is installed at field locations consisting of accelerometers that measure earthquake ground motions. This data is continuously monitored at the Operations Control Center and automatic alerts are issued if a significant earthquake is detected.

Seismic Design Pioneer

TAPS was the first pipeline in the U.S. which was designed to cross a major seismic fault without damage. Today, it continues to be an industry leader in earthquake response planning.

Stories & News

#TAPSPride

48 years of TAPS operations and fueling Alaska

For more than four decades, Alyeska Pipeline Service Company has played a reliable role in Alaska: North Slope producers delivered oil to TAPS, and the pipeline’s workers – the true caretakers of Alaska’s core economic driver – stewarded the safe delivery of that oil across hundreds of miles of historically challenging and stunning terrain to the terminal in the Port of Valdez. We knew people who helped build TAPS – we knew people that worked there and kept it going. We had seen historic photos and documentaries, and we pulled up alongside the pipe on road trips and Alaska outings to touch the cool steel and take pictures. We had neighbors who returned to and from the Slope like clockwork, and as Alaska seasons rolled on to the next, year upon year, TAPS thrummed along, consistent and resilient.

We stand together on the edge of a new time. We are witnessing the industry’s maturation, a turning point. “The way we’ve always done things” is fading against the brightness of fresh ideas. We still see airplanes full of our neighbors depart and return without fail, regardless of weekends and holidays. But who they are and the way they do their work is changing. We are benefiting from the greater diversity of minds and experiences, learning faster, and building up a workforce of professionals who are problem-solving for the pipeline’s path forward.  Automation is unveiling untapped potential to work smarter and safer. New science and equipment that would have been unimaginable in the 1970s is revitalizing a workplace that for so long felt unchanging. Indeed, for years, we noticed that industry pride in the fixed traditions and culture of the pipeliner’s workday; now there is booming enthusiasm for realizing and reaching potential, and a renaissance spirit toward seeing TAPS live well into the future.

Some things will not change. Trust remains TAPS’ precious license to operate. An indomitable focus on safety and environmental protection is paramount. These core values and commitments, combined with everyday learnings, historical knowledge, and cutting-edge science will carry us for decades to come. The impact of Alyeska Pipeline Service Co. to date is nearly immeasurable – what it has meant to Alaskans, for its excellent jobs, its stewardship, its delivery of riches that built up our state and our families, for its proud and amazing story of determination, grit, and ultimately, excellence.

And so it is incredible to consider our ability to make an impact as a company is only growing. We can make our communities even more vibrant, our state even stronger, our economic future only better. When TAPS was built, those early minds proudly mused of their feat, “They didn’t know it couldn’t be done.” As we look ahead to TAPS’ future, we are everyday enthusiastically imagining what we have yet to do.

TAPS Timeline

Major Milestones

For full TAPS timelines, read the TAPS Fact book.
Learn TAPS Facts from the Construction era.
Learn TAPS Facts from the Countdown to Construction.

Click links for more information on these historic moments and milestones.

1977

June 20 First oil flows from PS1 (10:26 a.m. Alaska Standard Time, pig in trap; 10:27 a.m. Alaska
Standard, pig depart signal).

June 24 Oil front at PS 3 (12:56 p.m.).

June 25 Oil front at PS 4 (7:50 a.m.).

June 28 Oil front at PS 5 (6:23 a.m.).

July 1 Oil front at PS 6 (6:30 p.m.).

July 4 Nitrogen leak detected ahead of oil front, MP 489.12 (near PS 8 north block valve). Oil flow stopped.

July 7 Pipe repair, MP 489.12. Pipe and elbow cracked from injection of super-cooled nitrogen. Pipe replaced.

July 7 Oil front at PS 8 (9:24 p.m.).

July 8 PS 8 pump building destroyed by explosion and fire; one fatality; oil loss, 300 barrels.

July 19 Oil leak (heavy equipment accident) at CV 7, 1,800 barrels.

July 20 Oil front at PS 9 (10:37 a.m.).

July 22 Oil front at PS 10 (4:46 a.m.).

July 26 Oil front at PS 12 (3:48 a.m.).

July 28  Oil reaches the Terminal (11:02 p.m.).

Aug. 1 ARCO M/V Juneau departs Valdez with first oil.

1978

Feb. 15 Oil spill caused by sabotage at Steele Creek, MP 457.53, 16,000 barrels.

March 7 PS 8 recommissioned.

1979: A historic year on TAPS

June 13 ARCO M/V Heritage, 1,000th tanker to load.

July 1 First commercial injection of DRA into pipeline at PS 1.

Oct. 2 PS 2 commissioned.

October Yukon River Bridge opened.

1980

Jan. 22 One billionth barrel arrives at the Terminal.

Sept. 20 Monument to pipeline construction workers dedicated at the Terminal.

Dec. 1 PS 7 commissioned.

1981

Dec. 15 First Kuparuk field oil delivered to PS 1.

1985

Jan. 11 M/V Overseas Boston, 5,000th tanker to load.

Nov. 2 Milne Point field start-up.

1986

April 18 Union Oil Pipeline Company (TAPS owner) becomes Unocal Pipeline Company.

Sept. 15  Five billionth barrel arrives at the Terminal.

Dec. 15 Lisburne field start-up.

Dec. 24 Sohio Pipeline Company (TAPS Owner) becomes Sohio Alaska Pipeline Company.

1988

Jan. 1 BP Pipelines, Inc. (TAPS owner) merged into Sohio Alaska Pipeline Company (TAPS owner).

Jan. 14 Highest daily throughput of 2,145,297 barrels.

1989

March 1 Sohio Alaska Pipeline Company (TAPS Owner) becomes BP Pipeline (Alaska), Inc.

March 24 Oil spill, M/V Exxon Valdez, 250,000 barrels; vessel runs aground at Bligh Reef.

July 10 Ship Escort/Response Vessel System (SERVS) established for oil spill prevention and response in Prince William Sound.

1990

Feb. 8 Alyeska and Regional Citizens’ Advisory Council (RCAC) signed contract.

July 31 Exxon M/V New Orleans, 10,000th tanker to load.

Aug. 25 1,000th SERVS escort.

1991

Feb. 28 ARCO Pipeline Company (TAPS owner) becomes ARCO Transportation Alaska, Inc.

1994

March 5 10 billionth barrel arrives at the Terminal.

1995

March 9 Valdez Emergency Operations Center/Escort Response Base opened.

March 30 Alyeska employees work 1 million consecutive hours without a lost- time accident.

Oct. 20 Alyeska and U.S. Department of Interior sign new Alaska Native Utilization Agreement.

December Alyeska completed construction on new otter rehabilitation facility.

1997

January Exxon Pipeline Company (TAPS owner) becomes ExxonMobil Pipeline Company.

Jan. 1 Phillips Alaska Pipeline Corporation (TAPS owner) stock reissued to Phillips Transportation Alaska, Inc.

June 20 20th anniversary of TAPS operations.

1998

Oct. 15 Alyeska and U.S. Department of Interior renew Alaska Native Utilization Agreement.

2000

June 30 Mobil Alaska Pipeline Company (TAPS owner) stock reissued to Williams Alaska Pipeline Company, LLC.

Aug. 1 ARCO Transportation Pipeline Company (TAPS owner) stock reissued to Phillips Transportation Alaska, Inc.

2001

Aug. 21 SERVS receives Distinguished Achievement award in recognition of outstanding third-party oil spill response to the grounding of the F/V Windy Bay in Prince William Sound.

Oct. 4 Bullet hole at MP 400 leaks 258,000 gallons of oil. More than 178,000 gallons recovered and reinjected into the pipeline.

Oct. 25 Alyeska and U.S. Department of Interior renew Alaska Native Utilization Agreement.

Nov. 2 First oil from Northstar field received at PS 1.

Nov. 9 Chevron M/V Mississippi, final tanker load after 30 years of service and 1,002 sailings, all ports (432 from the Terminal).

2002

June 20 25th anniversary of TAPS operations.

October Phillips Transportation Alaska, Inc. (TAPS owner) becomes ConocoPhillips Transportation Alaska, Inc.

Nov. 3 MP 588 experiences 7.9 magnitude earthquake; damaged shoes and VSM crossbeams repaired and replaced. No oil spilled.

Nov. 26 State of Alaska renews pipeline right of way for 30 years.

2003

April Alyeska Pipeline receives the American Petroleum Institute’s 2002 Environmental Large Operator Award and recognition for improved safety performance (29 percent reduction in OSHA recordables over a three-year period).

2004

March 31 Williams Alaska Pipeline Company, LLC (TAPS Owner) stock reissued to Koch Alaska Pipeline Company, LLC.

April Alyeska Pipeline receives the American Petroleum Institute’s 2003 Environmental Large Operator Award and recognition for improved safety performance (47 percent reduction in OSHA recordables over a three-year period).

2005

April Alyeska Pipeline receives the American Petroleum Institute’s 2004 Environmental Large Operator Award (no Pipeline Performance Tracking System (PPTS) releases).

Dec. 14 10,000th SERVS escort.

Dec. 21 15 billionth barrel arrives at the Terminal.

2006

April Alyeska wins the American Petroleum Institute’s Distinguished Environmental and Safety Award, API’s highest recognition for a pipeline operator. Alyeska also received the 2005 Environmental Large Operator Award (zero releases).

August Smart pig run from PS 1 to PS 4, successful.

September Smart pig run from PS 4 to the Terminal, not successful due to wax buildup. Rerun scheduled for March 2007.

2007

Feb. 9 Alyeska starts up new pumps at PS 9, the first station to receive upgraded equipment.

March Smart pig launches at PS 4.

March 22 Smart pig completes review of TAPS.

June 20 30th anniversary of TAPS operations.

Dec. 17 New pumps started at PS 3; second station to receive upgraded equipment.

2008

Jan. 23 Operations Control Center begins 24/7 operations in Anchorage.

2009

April Alyeska receives 2008 American Petroleum Institute’s Distinguished Operator Award (Large Operator), among the oil industry’s top honors and reserved for pipeline operators that demonstrate excellence in safety, environment and integrity. Alyeska also won API’s Distinguished Environment and Safety award for the fifth consecutive year.

May 21 New pumps started at PS 4: Third station to receive upgraded equipment.

July 10 SERVS marks 20th anniversary.

2010

April Alyeska is awarded the 2009 American Petroleum Institute’s award for top environmental performance in 2009.

2011

May 12 Alyeska Pipeline Service Company employees and contractors reach a major safety milestone: 10 million hours without a Day Away From Work Case (DAFWC).

July An Alyeska team completes the Low Flow Impact Study, a $10 million project designed to study and evaluate operational risks related to declining throughput.

Sept. 21 TAPS receives the 2011 Outstanding Environmental Engineering Geologic Project Award from the Association of the Environmental and Engineering Geologists.

2012

Jan. 9 Alyeska receives a legislative citation for its response to the January 2011 booster pump piping leak at Pump Station 1.

March 16 Alyeska Pipeline wins a World’s Most Ethical Companies Award from the Ethisphere Institute.

May Alyeska receives the Most Improved Projects Process Award for small projects (between $2 and $10 million) from Independent Project Analysis.

June 20 Alyeska reaches its 35th anniversary of operations.

Aug. 2 The 35th anniversary of first tanker leaving Valdez.

2013

July Koch withdraws as TAPS owner.

2015

February Vessel of Opportunity Program, managed by Alyeska’s SERVS team, wins the Ocean Leadership Award from the Alaska SeaLife Center.

March At Governor’s Health & Safety Conference, Alyeska wins a Governor’s Safety Award of Excellence.

December Alyeska finishes year with best safety performance on record, with Alyeska employees and contractors working a combined 5,827,988 hours with just four recordable injuries.

2016

Dec. 31 In 2016, the pipeline moved 189,539,817 barrels and averaged 517,868 barrels a day, the first calendar year-over-year throughput increase since 2002.

2017

June 20 Alyeska marks its 40th anniversary of pipeline operations. Activities throughout the year include public receptions and events and employee celebrations. The hashtag #40more launches.

Oct. 24 The Valdez Marine Terminal Operations Control Center, or XOCC, was officially disconnected from TAPS.

Dec. 31 In 2017, TAPS moved 192,472,797 barrels, a year-over-year total increase of 1.5 percent over 2016.

2018

July 1 The marine services contract transitions from Crowley Marine Corporation to Edison Chouest Offshore/Alaska Ventures.

2019

April Alyeska introduced an improved and modernized version of its Earthquake Management System, the system’s fourth update since TAPS start-up.

July 31 A team led by the University of Alaska Fairbanks completes the country’s first FAA-approved true beyond-visual-line-of-sight domestic flight of an unmanned aircraft system under the small UAS rule, flying along 3.87 miles of TAPS near the Chatanika River on the Elliott Highway.

Aug. 27 BP announces sale of its Alaska operations and interests, including Prudhoe Bay and the Trans Alaska Pipeline System, to Hilcorp Alaska.

Sept. 27 Major abatement and facility removal of Pump Station 10 is complete, marking first demolition of a legacy pump station.

December 18 billionth barrel departed Pump Station 1.

2020

May Alyeska receives a gold-level William A. Benkert Award for Environmental Excellence from the United States Coast Guard.

Nov. 10 Alyeska passes significant safety milestone: 30 million consecutive hours worked without a Days Away from Work Case (DAFWC).

2021

June 2 Alyeska, Ahtna renew Friendship Agreement.

July 31 U.S. Fish and Wildlife Service recognizes Alyeska with Outstanding Partner Award.

Dec. 21 BP Pipeline (Alaska), Inc. finalizes sale of ownership in TAPS to Harvest Alaska, LLC., an affiliate of Harvest Midstream Company.

2022

June 20 TAPS marks 45-year anniversary of operations.

October Finished installing reinforcement collars on VMT Crude/Ballast Tank Pressure Vacuum valves.

Dec. 31 Volume of oil through TAPS increased over 2021, marking the first calendar year-over-year increase since 2017.

2023

April 10 John Kurz named President and CEO of Alyeska Pipeline.

Aug. 15 TAPS returns to pigging after pigging operations suspended from PS 1 to 4 after stuck pig at CV 11 in July 2022.

Sept. 12 Alyeska named Project of the Year for Environmental Stewardship and Innovation Award at the Alaska Oil and Gas Association 2023 Conference.

2024

Feb. 15 Alyeska executives share new mission, vision, mindsets.

May 16 Haul Road celebrates 50-year anniversary.

Aug. 28 Alyeska and TAPS partners recognized with Project of the Year for work on asset retirement/legacy facility removal.

Oct. 8 Three-year project to stabilize GRB hill completed with the installation of 53 tie-back anchors and replacement of eight vertical supports.

Stories & News

Status and crews
Pump Stations

Status and crews

PUMP STATIONS, Status as of Jan. 1, 2024.

  • PS 1, 4 and 9 operating.
  • PS 5 operating as relief station.
  • PS 3 on warm standby.
  • PS 7 on warm standby, used in the winter to increase crude oil temperature.
  • PS 2 ramped down July 1, 1997.
  • PS 6 ramped down August 8, 1997.
  • PS 8 ramped down June 30, 1996.
  • PS 10 ramped down July 1, 1996. Demolished in 2019.
  • PS 11 was not built, but has maintenance facilities.
  • PS 12 ramped down April 1, 2005.

Crews: Crews vary per station; typically six to 25 employees. Personnel include security, maintenance, technicians, administrative professionals and safety employees. Shifts are generally one week on/one week off, or two weeks on/two weeks off.

Permanent Living Quarters: Permanent living quarters at PS 4, 5, 6 and 7. PS 1 personnel live in Deadhorse. PS 3 personnel typically live at PS 4. PS 9 personnel live in nearby communities.

E&A, Power
Pump Stations

E&A, Power

ELECTRIFICATION AND AUTOMATION (E&A): Electrification and Automation (also called “Strategic Reconfiguration” or “SR”) refers to Alyeska’s overall renewal of assets. Work began in 2001 and concentrated on reducing physical infrastructure and simplifying operations and maintenance. The project focused on creating more efficient operations while maintaining or enhancing safety, operational integrity and environmental performance. The system is modular and scalable and with flexibility for future increases or decreases in throughput.

As of March 2016, pump stations 1, 3, 4 and 9 were operating on new pumps; they have also been upgraded to use electrical (instead of diesel) power and are now automated [controlled remotely by Operations Control Center (OCC)]. Pump Stations 5 and 7 are using legacy equipment.

E&A upgrades include:

  • Three new electrically driven mainline pump/ motor modules or MLUs at each station.
  • Power generation modules at PS 1, 3 and 4 that include turbine drivers.
  • Transmission line and substations for power supply from North Slope Central Power Facility at PS 1 and from GVEA at PS 9.
  • Electrical distribution system and modules.
  • Tie-ins and interconnecting crude oil and fuel gas piping and supports.
  • Essential facilities for cold restart provided or maintained as appropriate.
  • Upgraded relief control system actuators.
  • Upgraded fire and gas systems.
  • New onsite control, data gathering and data transfer systems.
  • Upgraded pressure protection and process safety command system.

Power: All stations generate electrical power, with power plants ranging from 1.3  MW at PS 1 to 4.7 MW at PS 6, depending on availability of commercial power, presence of topping unit, and/or vapor recovery system. PS 8 and 9 also purchase commercial power.

Fuel Requirements: 30,000 to 60,000 gallons per day, average, per station (fuel oil equivalent).

Turbine engines, generators, pumps
Pump Stations

Turbine engines, generators, pumps

PUMP STATIONS, Turbines: Turbine engines drive the pumps.

TURBINE GENERATORS, Electrical: PS 1 has one Siemens SGT 400 12.9 MW and one Rolls Royce 401KB7S 5 MW turbine generator. PS 3 and PS 4 each have two Siemens SGT 400 12.9 MW turbine generators. The units provide electricity to the station for essentials such as heat and lighting, as well as power for operation of the newer electrical pumps. At PS 1, both units are natural gas fired. At PS 3 and 4, one unit each is fired on natural gas only, while one unit each can be fired on natural gas or liquid (diesel) fuel. Liquid fuel is only used when the natural gas line is out of service. At PS 1, the SGT 400 is the normal turbine generator in service. The Rolls Royce–powered turbine generator is a backup, and Prudhoe-area grid power can be imported, if necessary. At PS 3 and 4, one unit at each station is normally in operation during summer months, and both units are normally in operation at each station during the winter months when pump recycle is being utilized.

The fuel consumption of a gas-fired Siemens SGT 400 is about 3.5 million standard cubic feet per day at full load. The fuel consumption for a liquid-fired unit operating near full load is about 20,000 gallons per day. A gas-fired Rolls Royce 501KB7S running at full load consumes approximately 1.7 million standard cubic feet per day.

PUMPS, Booster: All pump stations have booster pumps to move oil from the storage tanks to the mainline. (PS 1 has two mainline booster pumps to boost oil pressure.) PS 5 has two injection pumps.

Misc.
Pump Stations

Misc.

THROUGHPUT, Current Maximum Daily: 1.14 million barrels average (with four pump stations operating). Rates exceeding 750,000 barrels require addition of drag reducing agent (DRA).

PUMP STATIONS, Recirculation: In order to add heat to the crude oil, the oil is recirculated within the pump station. This results in additional heat being added to the crude before it leaves that pump station.

PUMP STATIONS, Refrigerated Foundations: PS 1, 3, 5 and 6.

Crude Oil Tank Capacity: PS 1: 420,000 barrels; PS 5: 150,000 barrels; all others: 55,000 barrels.

VALVES, Pump Stations and Terminal:

  • Size: Two to 48 inches.
  • Design pressure: Varies to meet process conditions. (Class 150# through Class 2500#.)
  • Type: Gate, ball, check, plug, etc.

Fire Systems:

  • Airfield rescue and fire training provided at stations with airports.
  • Pump stations with airports have designated firefighting trucks for the airfields.
  • Types: Halon, NOVAC, water and foam, dry chemical, wet chemical and carbon dioxide.

Stories & News

Countdown to Construction
TAPS Facts

Countdown to Construction

Before a single piece of pipe was put into place in the world’s largest privately funded construction project, there was a historic effort to lay the framework for the Trans Alaska Pipeline System. Financing and ownership of the project had to be clearly delineated and planned, environmental concerns and lawsuits tackled, and the issue of Alaska Native traditional lands, through which the proposed pipeline would cross, had to be addressed. The major producers needed to develop a plan for design and construction of the project, and incorporated Alyeska Pipeline Service Company in 1970 to do just that.

To the right: November 16, 1973: President Nixon signed the Trans-Alaska Pipeline Authorization Act. It provided for construction of an oil pipeline in Alaska from North Slope to Port Valdez. The 800-mile-long pipeline took a little over three years to build & cost $8 billion. From the Richard Nixon Presidential Library and Museum.

Countdown to Construction timeline

1968

March 13
Atlantic Richfield Company (ARCO) and Humble Oil and Refining Company (now Exxon Company, U.S.A.) announce Prudhoe Bay discovery well. Read this PBS article on Prudhoe Bay discovery.

June 25
Confirmation well announced by ARCO and Humble Oil.

July 29
Pipeline field study team arrives in Alaska under authority of a transportation subcommittee of an ARCO-Humble North Slope Coordinating Committee.

Oct. 28
Atlantic Pipeline Company (a subsidiary of Atlantic Richfield), Humble Oil Pipeline Company (a subsidiary of Humble Oil and Refining Company) and BP Exploration U.S.A., Inc. (a subsidiary of British Petroleum Company, Ltd.) enter into an agreement for a planning study and for engineering design and construction of the Trans Alaska Pipeline Project.

1969

Feb. 7
Atlantic Pipeline, Humble Oil Pipeline and BP Oil Corporation (formerly BP Exploration U.S.A., Inc.) approve an amendment to their original agreement, electing to proceed with design and construction, and changing the name of the project to Trans Alaska Pipeline System. The acronym TAPS is coined.

Feb. 10
Atlantic Pipeline, Humble Oil Pipeline and BP Pipeline Corporation (a subsidiary of BP Oil Corporation) announce plans to build an 800-mile trans-Alaska pipeline.

June 6
TAPS files for federal right-of-way permits over public lands.

Sept. 13
First 48-inch pipe arrives in Valdez from Japan.

Oct. 22
Humble Oil Pipeline, Atlantic Pipeline and BP Pipeline are joined by Amerada Hess Corporation, Home Pipeline Company, Mobil Pipeline Company, Phillips Petroleum Company and Union Oil Company of California in joint venture.

December
Road from Livengood to the Yukon River was built (winter of 1969-1970).

1970

April
Lawsuits are filed by environmental groups and others to block pipeline construction.

Aug. 27
Trans Alaska Pipeline System Agreement made and signed by Atlantic Pipeline Company, BP Pipeline Corporation, Humble Oil Pipeline Company, Amerada Hess Corporation, Home Pipeline Company, Mobil Pipeline Company, Phillips Petroleum Company and Union Oil Company of California, all referred to as TAPS owners.

TAPS owners form Alyeska Pipeline Service Company, a separate corporation.

Agreement made to design and construct the Trans Alaska Pipeline. Alyeska Pipeline Service Company appointed as contractor and agent for the construction project.

1971

December 18
President Nixon signs the Alaska Native Claims Settlement Act into law, explicitly addressing aboriginal land claims in Alaska and paving the way for TAPS authorization.

Interested in how? Listen to this episode of Alaska Public Media’s Midnight Oil Podcast, or read this article on Alaska Native’s impact on the pipeline.

1973

Nov. 16
Trans Alaska Pipeline Authorization Act (TAPAA) becomes law.

1974

Jan. 3
Federal right-of-way grant issued

April 29
Construction of road from Prudhoe Bay to Yukon River begins.

May 3
State right-of-way lease issued.

Sept. 29
Road from Prudhoe Bay to Yukon River completed.

1975

March 27
First pipe laid at Tonsina River.

Want more Countdown to Construction information? Check out this pipeline chronology developed by the PBS.

Stories & News

The Dalton Highway / Haul Road
TAPS Facts

The Dalton Highway / Haul Road

DALTON HIGHWAY (Formerly North Slope Haul Road): James B. Dalton Highway is the name applied by the state in 1981 to 415 miles of roadway, including the North Slope Haul Road and the 57- mile road from the Yukon River to Livengood, constructed by Alyeska in the winter of 1969-70.

This section of road was originally 56 miles, but one mile was added after realignment by the state at Livengood in 1981. James B. Dalton was a native-born Alaskan and graduate mining engineer who supervised construction of the Distant Early Warning (DEW) Line in Alaska. He was an expert in Arctic engineering and logistics and served as a consultant in early oil exploration in northern Alaska, pioneering winter trails for heavy equipment transport.

The following information about the highway is current as of construction:

  • Bridges, permanent: 20.
  • Grade: 12 percent maximum.
  • Gravel used: 32 million cubic yards.

Ownership: Originally Alyeska; control transferred to the state in October 1978.

HAUL ROAD: Portion of Dalton Highway from the Yukon River to Prudhoe Bay. Built by Alyeska.

  • Cost: $125 million, approximately.
  • Dates: Started April 29, 1974; completed and dedicated September 29, 1974.
  • Labor: 3 million hours.
  • Time: 154 days.
  • Length: 358 miles (Yukon River to Prudhoe Bay).

The Journey to Prudhoe

Even today, the journey to Prudhoe Bay is far from easy. But in 1975, just after the Dalton Highway/Haul Road was completed, thousands of tons of critical equipment and infrastructure for North Slope rigs and modules were hauled there from Houston, Texas, through the Panama Canal, around Mexico, and up the West Coast by tough tugs, barges and crews. After some fabrication in Tacoma, the Arctic-bound armada headed toward Prudhoe Bay in a race to avoid an ice pack and meet deadlines. Learn all about it and follow the journey in this awesome TAPS #TBT film.

Stories & News

TAPS construction

“They didn’t know it couldn’t be done.”

This was the motto adopted by Alyeska’s first employees – tens of thousands of men and women who teamed up to tackle the world’s largest privately funded construction project. And that now famous (and infamous) quote is now set in concrete on a statue in Valdez, celebrating the workers who built the iconic pipeline.

Designing and building the Trans Alaska Pipeline System presented unprecedented challenges. The 800-mile-long steel pipe would cross mountain ranges, rivers and major earthquake fault lines. Alaska’s semi-frozen permafrost prompted the engineering decision to build more than half the line above ground. Teams lived in construction camps along the line. The largest field camp at Isabel Pass had more than 1,600 beds. The smallest, Sourdough, could hold 125 workers. In all, more than 70,000 individuals worked on TAPS’ construction.

Considering the project’s scope and Alaska’s harsh conditions, crews worked at an astonishing pace: Construction on roads, facilities and the pipeline began in April 1974 and finished in June 1977. Oil flowed on June 20, 1977, and the first tanker carrying Alaska North Slope crude oil pulled away from its berth at the Valdez Marine Terminal on August 1, 1977. The final price tag on TAPS’ construction: a staggering $8 billion.

Construction

The final numbers

Time: Three years, two months (April 29, 1974 to June 20, 1977) to complete pipeline, pump stations, roads and Terminal.

See TAPS Construction Timeline below

Cost: Approximately $8 billion for entire system, including Valdez Marine Terminal and pump stations, at conclusion of initial construction period in 1977. Does not include interest on capital investment or capital construction after 1977.

Contractors and Subcontractors: 2,000, approximately.

Workforce:

  • Minority hire: Ranged from 14-19 percent.
  • Peak, contractors only: 21,600.
  • Peak, total: 28,072 in October 1975 (Alyeska employees and contractors).
  • Total for project: 70,000 approximately (1969-1977).
  • Women: Ranged from 5-10 percent.

Fatalities: 32 incidents directly related to construction (includes employees of Alyeska, contractors and subcontractors; excludes common carriers).

Camps: Largest camp: Valdez Marine Terminal, 3,480 beds.

  • Largest pipeline camp: Isabel Pass, 1,652 beds.
  • Number, from 1974-1977: 29 total.
  • Smallest pipeline camp: Sourdough, 112 beds.

Pump Stations: Original design called for 12 pump stations with four pumps operating at each pump station. PS 11 was never built.

Learn more about the TAPS Pump Stations

Valdez Marine Terminal (Terminal): The Terminal was designed to load tankers and provide the storage capacity in TAPS to allow production on the North Slope to operate without impact-related delays from the marine transportation system. It occupies approximately 1,000 acres on the southern shore of Port Valdez. Cost to build: $1.4 billion.

Learn more about the Valdez Marine Terminal

Construction

Early history

Early history: The Trans Alaska Pipeline System (TAPS) was originally called the Trans Alaska Pipeline Project, and was a joint venture of Atlantic Pipe Line Company (now ConocoPhillips Transportation Alaska, Inc.), Humble Oil Pipeline Company (now ExxonMobil Pipeline Company) and BP Oil Corporation [later BP Pipelines (Alaska) Inc.], formed to develop a plan for construction of a pipeline for Prudhoe Bay oil.

Time for pre-construction effort: Six years, approximately.

Learn more at Countdown to Construction

Notices to proceed: 465 federal and 403 state notices to proceed were required from the Federal Alaska Pipeline Office and the State Pipeline Coordinator’s Office.

Permits: 515 federal and 832 state permits were required to build TAPS.

Archeological survey, pre-construction: The entire TAPS route was surveyed by the University of Alaska and Alaska Methodist University under contract to Alyeska. The survey, which cost approximately $2.2 million, resulted in the excavation of approximately 330 sites.

Soil surveys, pre-construction:

  • Bore holes: 3,500, approximately.
  • Soil samples: 15,000, approximately.

Materials

  • Gravel for entire project: 73 million cubic yards.
  • Gravel for work pad: 32 million cubic yards.
  • Largest piece shipped: Floating tanker berth (3,250 tons).
  • Shipped to Alaska: 3 million tons, approximately.

Pipe: Pieces required for pipeline: More than 100,000 – 40- and 60-feet long, 48 inches in diameter.

Total pipe shipped: 550,000 tons, approximately; 120 shiploads for original construction. Manufactured in Japan.

Pipe welds

  • Double joints: 42,000 (a double joint is two pipe sections welded into a single length before transport to the field for placement in the line).
  • Field girth welds: 66,000.
  • Passes for field girth welds: Seven for 0.562- inch pipe; six for 0.462-inch pipe.
More milestones

More milestones

Dalton Highway (Formerly North Slope Haul Road): Constructed by Alyeska in the winter of 1969-70. Originally owned by Alyeska; control transferred to the State of Alaska in October 1978.

Haul Road (Portion of Dalton Highway from the Yukon River to Prudhoe Bay.) Built by Alyeska, started April 29, 1974; completed and dedicated September 29, 1974.

Learn more about the Dalton Highway and Haul Road

Bridges:

Pipeline: 13 total along TAPS.

Road: 10 north of Yukon; 36 south of Yukon.

Yukon River bridge: Located at MP 353.3, construction dates: 1974-1975. Opening date: October 1979.

Learn more about Bridges on TAPS

Airfields:

  • Seven, 2,500 to 3,000 feet long.
  • Seven, 5,000 feet long.

Operations: Two of the 14 airfields built during TAPS construction are still in operation: Galbraith Lake (5,200 feet long) and Prospect (5,000 feet long). These two airfields are on federal land and are operated under state leases.

Ditch:

Buried Pipeline: 8 feet wide, 8 feet deep, approximately, but variable for overburden depth, which ranged from 3 to 35 feet.

Construction Timeline

See Countdown to Construction for the years of work and negotiations that took place before construction began

See Since Start-up for a timeline of 40-plus years of work on TAPS since oil entered the pipeline.

1974

April 29 Construction of road from Prudhoe Bay to Yukon River begins.

May 3 State right-of-way lease issued.

Sept. 29 Road from Prudhoe Bay to Yukon River completed.

1975

March 27 First pipe laid at Tonsina River.

Oct. 11  Yukon River Bridge completed.

Oct. 26  Pipeline project 50 percent complete.

1977

May 31 Final pipeline weld near PS 3.

June 20 First oil flows from PS 1
(10:26 a.m. Alaska Standard Time, pig in trap; 10:27 a.m. Alaska Standard, pig depart signal)

Stories & News

TAPS crosses 13 river bridges as it progresses across Alaska. Most notably, TAPS crosses the mighty Yukon River at Pipeline Milepost 353. The E.L. Patton Yukon River Bridge was named after Edward Patton who served as president of Alyeska during pipeline construction. The 2,295 foot-long bridge was completed in 1979. The bridge provides a river crossing for the pipeline and allows vehicle access to the Dalton Highway, the major supply line for the North Slope.

Tanana River bridge

Bridges

Here are some TAPS Facts on bridges:

  • Bridges, Pipeline
    • 13 total along TAPS.
  • Bridges, Road
    • 10 north of Yukon; 36 south of Yukon.
  • Bridge, Yukon River: Located at MP 353.3.
    • Construction dates: 1974-1975.
    • Cost: $30 million (owners’ share approximately $10 million).
    • Dimensions: 2,295 feet long; road deck 30 feet wide; grade 5.99 degrees.
    • Name: Bridge officially named E.L. Patton Yukon River Bridge by Alaska Legislature in 1982, after E.L. Patton, president of Alyeska during pipeline construction. A monument to E.L. Patton was dedicated in October 1982.
    • Opening date: October 1979.
    • River width: 1,900 feet, typical.
  • DALTON HIGHWAY (Formerly North Slope Haul Road)
    • Bridges, permanent: 20.
Yukon River bridge
Tanana River bridge
Dietrich River bridge
Yukon River bridge

Stories & News

TAPS Facts

Animals / Wildlife on TAPS

Animal Crossings, Mainline Pipeline

The purpose is to allow for free movement of big game animals (caribou, moose, etc.) across the pipeline right of way. Approximately 579 animal crossings are incorporated into TAPS, including:

  • Elevated: 554 (minimum height 10 feet).
  • Buried: 23 (each about 200 feet long).
  • Buried, refrigerated: 2 (MP 645 and MP 649).

Bird Species

  • More than 170 identified along the TAPS route.
  • Inland bird response module – TAPS maintains a 40′ long, refrigerated connex that is self-contained for bird response. It runs on one generator and can be set up by one person. Up to 150 birds can be treated at a time and shipped to the Wildlife Response Center in Anchorage.

Caribou

  • TAPS crosses the ranges of the Central Arctic Herd on the North Slope and the Nelchina Herd in the Copper River Basin.

Fish Species

  • 34 identified in waters crossed by the pipeline.
  • TAPS crosses and monitors 749 active fish stream drainage structures

Other wildlife along the TAPS route include:

  • Moose
  • Muskox
  • Bear
    • Brown
    • Black
  • Wolverine
  • Fox
  • Marine wildlife in Port Valdez
    • Otters
      • Alyeska maintains an Otter Rehabilitation Module, also known as the “Otter Hospital”. It is a rare facility designed to treat and rehabilitate otters affected by an oil spill. It was originally designed and built in the mid-1990s. In 2017, Alyeska upgraded and fully demonstrated the facility to confirm optimum readiness and fit-for-purpose for deployment during a spill response.
    • Sea Lions
    • Seals
    • Orcas / Killer whales
    • Whales

A Pipeline … and Animals!

Narrated by the famous Mel Blanc

This fun and fascinating film from the ’70s introduces a menagerie of Alaska’s amazing animals and illustrates how they coexist, make their homes, and travel along the 800-mile TAPS route.